09/08/2026
On-going project. Installation of Electrical and Auxiliary System for CCTV and Fire Detection and Alarm (FDAS). Future Railing installation of Solar Panels of 40kw Hybrid Inverters, 40 kW three-phase hybrid, and approximately 52kwp PV.