10/23/2018
The signal has been in the Air and running since the 28th. As of right now, we still do not have fiber as the contract said it would be. I have been told for 3 weeks now that it’s on its way, their working on it, it’s escalated as high as it can be, etc. It has been a long road to get to this point, and it looks like it’s about to finally come together, if they can just get their act together with the Fiber. Some of you had rescheduled, to reschedule, and we are working to make good on that on our end as well. Sorry for the confusion it has brought to us all, it should be getting better this week. From the looks of things, the fiber delayed things just over a month as we were set to have it Sept 28th, and we are just about at Oct 28th, and still waiting. We started doing the home/business installs, as available, but they do take a little longer without the fiber connected, allowing us to see both sides of the link at the same time. We will let you guys know when it’s up and running for good, as they said this last Friday we are looking at no more than 15 days.