30/05/2026
A local farm enlisted Hassie’s help to tackle their escalating electricity costs. Fortunately, an 11KV line ran through their property, facilitating a three-phase upgrade in partnership with the National Grid. The project utilized components close to supply, including a GRP unit with Sigenergy three-phase inverters and a three-phase off-grid backup gateway connected to 50KW of Aiko Bifacial solar panels. These panels capture sunlight from both sides, potentially increasing annual energy production by 25%. This setup not only proved cost-effective but also minimized energy loss. The system is expected to achieve payback in as little as four years, not accounting for the tax advantages from Capital Allowance