A technician shouldn’t have to walk 15,000 steps a day just to finish standard maintenance.
When dealership turnaround times increase, the immediate reaction is usually:
→ "We need more bays."
→ "We need more hiring."
Most often, the problem isn’t technician speed it’s systemic friction:
Off-Ramp Transit: Minutes lost walking back and forth to parts counters and tool racks.
- Outdated Benchmarks: Standard fixed-rate task times based on historical assumptions rather than real-world workflows.
- Ergonomic Strain: Awkward reaches and redundant motions that cause physical fatigue by mid-day.
At Qematic, we conduct non-obtrusive on-site Time and Motion Studies to isolate mechanical wrench time from layout inefficiencies.
By analyzing micro-motions and workflow steps, we help operations leaders:
- Recalibrate standard repair benchmark timings (takt times).
- Redesign bay floor plans for point-of-use tool accessibility.
- Implement Just-In-Time (JIT) parts kitting directly to the ramp.
- Free up double-digit workshop capacity without heavy capital expenditure.
Optimize the system, not the pressure on the technician.
Have you audited your workshop's standard repair timings recently?