Soil Testing Services

Soil Testing Services Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Soil Testing Services, C-101/A KDA Scheme 1, Karachi.

Soil Testing Services opened its doors in 1997 headquartered in Karachi, Pakistan and has been providing a broad range of engineering and consulting services to industrial, commercial, governmental and private clients across the country.

Pile Dynamic Analysis – Capacity and Condition in One Test Pile Dynamic Analysis (PDA) is a field test that will give th...
03/11/2026

Pile Dynamic Analysis – Capacity and Condition in One Test

Pile Dynamic Analysis (PDA) is a field test that will give the engineer information on how a pile is actually performing. The pile is struck by a controlled hammer blow and the force and velocity as it passes through the pile are measured. From the response received, the load that can be added to the pile and the condition of the pile can be determined.

The test provides information on the axial capacity of the pile both in compression and in tension, detects flaws like cracks, necking or weak sections of the shaft, records the stresses applied to the pile during the driving process and indicates the performance of the pile and the energy delivered by the hammer.

At STS, project teams have a reliable set of field data to rely on, providing the ability to safely and efficiently design foundations, rather than conducting a complete static load test.

Call STS for pile testing and geotechnical services for your next project.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

Force Alone Is Just Crushing — Control Matters Any hydraulic press can crush a concrete cylinder. Turning that break int...
02/11/2026

Force Alone Is Just Crushing — Control Matters

Any hydraulic press can crush a concrete cylinder. Turning that break into a defensible engineering test requires control.

Under ASTM C39/C39M, a compression test is governed by strict tolerances—from measuring specimen diameter to the nearest 0.25 mm and aligning the spherical bearing block, to applying axial load continuously and without shock within a controlled stress-rate window.

At Soil Testing Services (STS) in Karachi, we have commissioned the SY-2000 electro-hydraulic compression testing system (2000 kN capacity, Grade 1 ±1.0% load accuracy). By pairing precision hydraulic load/unload pacing valves with real-time digital load and stress-rate readout, our laboratory maintains tight control over how every specimen is loaded to failure.

When structural design decisions, formwork stripping, and compliance sign-offs depend on a single number on a test report, how the load was applied matters as much as the peak load itself.

Contact STS for concrete compression testing carried out to standard and reported on time.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

High Strain Dynamic Testing – Clear Insights Into Your Foundation  The amount of the pile is a function of its ability t...
29/10/2026

High Strain Dynamic Testing – Clear Insights Into Your Foundation

The amount of the pile is a function of its ability to deliver. The capacity is determined by High Strain Dynamic Testing (HSDT) which doesn't require weeks of setup, kentledge and downtime as does a static load test. A controlled impact is applied to the head of the pile, the response is recorded and then analyzed after impact to give the load that the pile can support as well as the condition of the pile.
cfgvr
That pace transforms what can be achieved onsite for a project team. A long test programme can be avoided, some of the decisions can be taken while the work is still in progress, and unnecessary conservatism can be avoided on the design and material and programme costs can be controlled.

Soil Testing Services (STS) tests are done by engineers who have actually tested on real locations using up to date equipment and unbiased interpretation of the results. We take reporting deadline seriously as we take the test itself seriously as the results that are late to be reported help no one.

The readings you will receive from STS are more than just set readings. It's the confidence in the materials that lie underneath the structure.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

Groundwater Exploration and Well Drilling at Gharo STS has dug a deep water well at BYD Gharo site for Mega Motors BYD a...
21/10/2026

Groundwater Exploration and Well Drilling at Gharo

STS has dug a deep water well at BYD Gharo site for Mega Motors BYD and the outcome was a success.

The drilling encountered an artesian aquifer at approximately 600 feet. In such a formation, the water was contained at high natural pressure between impermeable rock or clay layers and, after the formation was drilled, the water flowed up the borehole by itself. This increase indicated that there was a good hydrostatic head and, in turn, a reliable long-term water supply to the facility.

It takes more than a drilling rig to find and develop a resource such as this one. This requires knowledge of the geology and proper interpretation during drilling, as well as a well designed borehole to tap the appropriate zone. This project illustrates our work in hydrogeology and that is what we are good at doing.

STS continues to deliver reliable water supply solutions for industrial clients across Pakistan.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

Building Access Before Building Data – Mangrove Site InvestigationA geotechnical team performs tests for mangrove sites ...
12/10/2026

Building Access Before Building Data – Mangrove Site Investigation

A geotechnical team performs tests for mangrove sites before the first borehole is sunk. The ground is soft, the tide dictates what can be done or not done at different times, the ecosystem remains protected and usually there is no route in for a rig. STS has undertaken investigation work in such situations.
First, we start to plan: the work is planned around tidal windows and the methods are chosen to ensure they adhere to the standards applicable and to the environmental constraints associated with the site. If there is no access, we create it! Temporary routes and working platforms are built using approved solutions (timber matting, steel plates and/or controlled temporary fill etc) which provide a stable platform for rigs, equipment and crews to operate on whilst minimising disturbance to the environment surrounding the works.
This delivers reliable subsurface information from hard-to-reach areas, all while being safe and with a minimal footprint on the environment.
Get in touch with STS to coordinate an investigation in challenging and/or sensitive environments.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

Plate Load Test for Orient Energy Systems STS has conducted Plate Load Tests for Orient Energy Systems for Foundation De...
07/10/2026

Plate Load Test for Orient Energy Systems

STS has conducted Plate Load Tests for Orient Energy Systems for Foundation Design of their project at Nooriabad.

A rigid steel plate is placed on the prepared ground and loaded in increments while the settlement at each loading increment is recorded using dial gauges in this test. Based on this load-settlement behaviour, our engineers will determine the safe bearing capacity of the soil and the settlement that will occur under the design loads. The test measures the load directly to the ground at the foundation level so it is a practical test that reflects what the soil will do in the field.

They were all held and monitored until the settlement was stabilised and the results were reported promptly for the design team to move forward with confidence.

Find STS for on-site testing and geotechnical services for your next project.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

Testing the Piles Behind the Expressway STS has conducted Pile Dynamic Analysis (PDA) for Malir Expressway (Shahrah-e-Bh...
30/09/2026

Testing the Piles Behind the Expressway

STS has conducted Pile Dynamic Analysis (PDA) for Malir Expressway (Shahrah-e-Bhutto) project in Karachi, one of the major road infrastructure projects of the city.

This test consists of a hammer blow to the pile head and recording of strain and acceleration on the pile. These readings are used by our engineers to determine the load capacity of the pile, the resistance of the soil along the shaft and at the base, and the condition of the pile. It is a quick and accurate method to verify that the piles will support the loads placed in the design, without the time and expense of a complete static load test.

The testing was conducted on an elevated corridor where all piles are subjected to a constant heavy traffic, therefore, testing was done under close supervision and reported promptly to ensure continuous construction activity.

Meet STS for your next infrastructure project pile testing and geotechnical services.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

In-Situ Pressure Meter Testing at DP World Jetty STS conducted Pressure meter Tests (PMT) in boreholes drilled across th...
24/09/2026

In-Situ Pressure Meter Testing at DP World Jetty

STS conducted Pressure meter Tests (PMT) in boreholes drilled across the water from the steel working platform on the DP World jetty. The probe was then lowered to the desired test depths and expanded against the borehole wall in controlled steps, and pressure and volume measurements were made at each step.

In contrast to tests on recovered samples, the pressure meter tests the behavior of the natural undisturbed ground. Key results from these tests are the in-situ deformation modulus and limit pressure of the soil, which are important factors for the design of piles and marine structures under lateral and vertical loading. The activity of the port required careful coordination, constant monitoring and safety precautions from the platform.

Considering a project close to the water? Call STS for accurate soil information on which to work.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

We are pleased to announce the opening of our new branch at Ittehad Commercial, DHA Phase 6, Karachi, established to pro...
04/09/2026

We are pleased to announce the opening of our new branch at Ittehad Commercial, DHA Phase 6, Karachi, established to provide our clients with greater convenience and easy access to our professional testing and geotechnical services.

At our new branch, we provide a comprehensive range of services, including:

🔹 Soil Investigation & Geotechnical Testing
🔹 Concrete Testing
🔹 Construction Material Testing
🔹 Soil & Aggregate Testing
🔹 Field & Laboratory Testing
🔹 Geotechnical Investigation Services

With our experienced technical team and modern testing facilities, Soil Testing Services (STS) is committed to delivering reliable, accurate, and professional testing solutions for residential, commercial, and infrastructure projects.

📍 New Branch: Building No 16-C, Anum Tower, Ln Number 2, Ittehad Commercial, DHA Phase 6, Karachi

Your Convenience. Our Expertise. Reliable Testing Solutions.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

Building the Ground – We Built the Platform Before We Built the Data STS has successfully completed geotechnical investi...
31/08/2026

Building the Ground – We Built the Platform Before We Built the Data

STS has successfully completed geotechnical investigation works over water at the DP World jetty, where the absence of stable ground, active port operations and restricted access required a specialized approach.

To create a safe working area, STS designed, fabricated and installed a purpose built steel working platform extending from the existing jetty toward the waterfront. The complete scope, from design and inhouse fabrication to lifting and installation, was executed by our own team in compliance with applicable safety standards. Believed to be the first platform of its kind built in Pakistan for geotechnical investigation, it allowed rigs, equipment and personnel to operate safely directly above the required locations.

Connect with STS to plan your next marine or waterfront geotechnical investigation with confidence.

𝗪𝗵𝗮𝘁𝘀𝗔𝗽𝗽:
https://wa.me/923008226262

𝗣𝗵𝗼𝗻𝗲:
92-21-34381117

Follow us on
https://lnkd.in/d849y-V9
https://lnkd.in/d_jM85nq
https://lnkd.in/d4x3z-8K

Address

C-101/A KDA Scheme 1
Karachi
75350

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 09:00 - 13:00

Telephone

+92-21-34381118

Alerts

Be the first to know and let us send you an email when Soil Testing Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Soil Testing Services:

Shortcuts

Share

Nearby computer & electronics services