OVC low-voltage led lighting systems, Wired/Wireless networks. CCTV. Smart Home Technologies. Your safety and convenience are our utmost priorities.

Digital Signage, Drive-Thru Systems, Access Control, Alarm Systems, Structured Cabling, Home Theater systems, whole-house A/V. OVC Cabling is your go-to automation company in Clarksville, IN, serving surrounding Kentucky and Indiana areas. Our in-depth focus on automation allows you to enjoy a seamless, intelligent environment. Our comprehensive services include automation for lighting, fans, blinds, fire alarms, and more, ensuring hassle-free facility management. You can also trust our team with CCTV installation and programming, digital signage, structured cabling, and more. Schedule a consultation today to discover how we can elevate your business.

11/12/2026

The newest copper cabling standard added a pass/fail test for high-power PoE. Most installed links were never tested for it, and no rule forces your next project to be, unless someone writes it into the specification.

ANSI/TIA-568.2-E sets hard limits on DC resistance unbalance, or DCRU: 3% within-pair and 7% pair-to-pair, with a 0.20 ohm cap in both cases. Why it matters: under high-power PoE, those four pairs are carrying DC current as well as data. When the resistance between pairs or within a pair is uneven, current loads unevenly too. The result is extra heat in the cable and the powered equipment, distorted Ethernet signals, and packet errors that show up as flaky cameras, access readers and access points long after the installer has left the site.

Here is the part facility owners and IT managers should know: a standard link certification can pass while skipping DCRU entirely. Field testing for it is not yet mandatory industry-wide. It only gets run when the project specification, the manufacturer's warranty program, or the customer asks for it. A link can be "certified" and still carry a resistance imbalance that surfaces as heat and dropped packets on a 90W camera or access point two years in.

What this means in practice:
1. If your facility runs or plans high-power PoE (90W cameras, Wi-Fi 6E/7 access points, displays, building controllers), make DCRU testing part of the cabling specification before the contract is signed.
2. Ask which test limits your installer certifies against. Modern field testers report DCRU as a pass/fail result; a report that omits it tells you the test was not performed.
3. Remember that poor terminations are a leading cause of DCRU failures, so the test is also a window into workmanship quality.

At OVC-Cabling we certify copper runs to current standards and test for the parameters that high-power PoE actually stresses, not just the ones a legacy checklist mentions. If you are budgeting cameras, access points or building devices that draw serious power, ask us what your specification should say before the cable goes in the ceiling.

11/12/2026

When a wireless refresh is on the table, most of the attention goes to the access points. The standard now says to look at the cable behind them first.

The current ANSI/TIA-942-C standard calls for a minimum of two Category 6A runs to every wireless access point. A single drop used to be the norm. It moved because one cable can no longer carry what a modern access point asks of it, for three reasons.

Redundancy: if a cable or switch port fails, the access point stays on the air instead of taking a coverage area down with it.

Link aggregation: two paths let capable access points combine throughput instead of hitting the ceiling of a single run.

PoE headroom: Wi-Fi 6E and Wi-Fi 7 access points draw more power, and power at that level heats the cable and raises resistance. Two runs share the load and keep performance stable.

The catch for existing buildings: cabling installed in the one-drop era rarely has the spare conduit, tray space or switch ports to add a second run cleanly. Retrofitting means reopening ceilings that were just closed, and paying for it twice.

OVC-Cabling installs access-point cabling with that headroom built in from day one: certified Cat6A runs, conduit and tray capacity for a second drop, and switch ports reserved for it. On a new floor or an upgrade, the second cable is planned before the first one is pulled.

If a Wi-Fi 6E or Wi-Fi 7 rollout is on your calendar, ask whether the ceiling is ready for two cables, not one.

11/10/2026

📹 Searching security camera footage is starting to look a lot different.

One of the more interesting developments in video surveillance is the ability to search recorded video using everyday language.

🔎 Uniview SeekFree technology, for example, allows someone to enter a description such as:

👉“Person wearing a blue top and holding a yellow bag”

…and search recorded footage for matching results. The system can search using descriptions involving people, vehicles, objects, attributes, behaviors, and locations.

⏱️ Think about situations where there may be hours of recorded footage to review.

Instead of relying only on timestamps or manually watching through video, descriptive search provides another way to narrow down what you're looking for.

🏢 Examples include searching for a particular vehicle, an object such as a yellow bag, or activity such as someone operating a forklift without a safety helmet.

🤖 It’s a good example of how AI is beginning to change CCTV from simply recording what happened to helping users find the relevant footage afterward.

Technology in the security industry continues to evolve, and this is a pretty interesting look at where video search is headed. đź‘€

💬 Have you ever had to search through hours of camera footage to find one event? We’d be interested to hear your experience.

11/05/2026

A new international standard now treats your cable runs as part of your security perimeter. ISO/IEC 24383, published in September 2026, defines four security levels, Open, Restricted, Secure, and Highly Secure, for protecting cabling, pathways, equipment rooms, and telecommunications spaces from unauthorized access, tampering, and modification.

The premise is simple: an attacker who reaches an unmonitored patch panel, an exposed riser, or an unlocked telecom room can tap, alter, or disable a network without ever touching a firewall. The standard calls for less-exposed pathway routing, segregated infrastructure, monitored enclosures and tamper-evident seals, camera coverage of critical spaces, and automated infrastructure management so every connection can be tracked and audited.

The catch is that these controls only work if the infrastructure was built to support them. Pathway routing, room placement, enclosure selection, and documentation are decided at installation, not retrofitted afterward.

When OVC-Cabling designs and installs low-voltage infrastructure, we plan for physical-layer security from day one: controlled telecommunications rooms, protected pathways, discreetly positioned CCTV coverage, access control on sensitive spaces, and accurate as-builts that support audits and incident response. Whether your building is a new construction or an existing facility being upgraded, we can help you assess where your cabling is exposed and close the gaps.

If your security review stops at the server room door, it is missing half the network. Talk to us about protecting the other half, the part in the ceiling.

11/03/2026

Every EV charging depot is really two projects: an electrical one and a network one. Standards bodies are now treating the network side as seriously as the power side, and the details matter for anyone planning a commercial rollout.

The Open Charge Alliance's OCPP Security Operations Guide calls for TLS-encrypted connections and PKI-based mutual authentication between chargers and backend systems. Elaad's EV-311 requirements, built on IEC 62443, set procurement-grade expectations for hardened hardware and tamper-resistant interfaces. And a UK government consultation published last week proposes a cybersecurity baseline for public charge points, including network isolation requirements.

What do these frameworks have in common? They all assume infrastructure that can actually deliver the isolation. Chargers on one network segment, business systems on another, payment and energy-management traffic separated, with no undocumented cable sharing the pathway. If the cabling is flat and untraceable, those protections exist on paper only.

That's where OVC-Cabling comes in: structured cabling and conduit sized for today's charger count with headroom for expansion, dedicated pathways and switch capacity per segment, fiber backbones linking charging yards to administration buildings, and accurate as-builts so every charger connection is documented for audits and incident response.

Whether you're planning a fleet depot, a workplace installation or a public charging site, the network plan should be on the table as early as the power plan.

OVC-Cabling delivers the connectivity layer that keeps charging operations online, secure and ready to grow. Talk to us before the first trench is dug.

10/29/2026

Automated warehouses don't run out of Wi-Fi. They run out of wired infrastructure.

Autonomous mobile robots, barcode scanners and IoT sensors put wireless networks under pressure that offices never see: continuous roaming, sustained device density, and zero tolerance for interruption. A robot that drops its connection mid-pick stops production, not just someone's video call.

The industry guidance for robot-ready Wi-Fi is demanding for good reason: roam times under 50 milliseconds, latency below 20 milliseconds, packet loss under 0.1%. Those numbers are set in the air, but they're delivered over the wire. If access points are mounted wherever it's convenient instead of where the robot paths actually cross, if the IDFs feeding them are an afterthought, or if uncertified cabling introduces instability that looks exactly like an RF problem, no amount of tuning recovers it.

That's why warehouse networks should be designed from the wire up:

- IDF placement and structured cabling planned before access point positioning
- Certified, labeled runs to every AP, so physical-layer faults don't masquerade as wireless issues
- Segmentation that keeps robot and controller traffic separate from business data
- Headroom for what's next, including 6 GHz offload as device fleets catch up

Automation is only as reliable as the infrastructure underneath it. If you're planning a robotic rollout or a warehouse retrofit, let's talk before the racks arrive.

10/27/2026

Your HVAC, lighting and fire systems are on your network. A new NIST guide says attackers know it.

NIST's 2026 "Tips and Tactics" for building automation and control systems (BACS) lays out what facilities and IT teams should already be doing: put building systems on their own network segment instead of sharing the corporate network, restrict what traffic can pass between zones, remove public internet exposure entirely, change factory passwords, and keep a full inventory of every connected device.

Good guidance. But here is what it assumes: a physical layer that can actually separate those systems.

Segmentation on paper fails in the ceiling when controllers, sensors, lighting gateways and cameras all ride the same cable runs into the same switch. If your building systems and your business network share pathways and switch ports, the "dedicated segment" NIST calls for cannot physically exist, and one compromised controller becomes a route into everything else.

Making BACS isolation real takes planning at installation time: dedicated cabling and pathways for building systems, switch capacity and PoE reserved per zone, separation between security, life-safety and IT traffic, and accurate as-builts so every connection is known before a firewall rule is written.

If you are renovating, expanding or replacing a building management system, that is the moment to get the cabling right. OVC-Cabling designs and installs the low-voltage infrastructure that makes building-systems segmentation achievable, documented and future-ready.

10/26/2026

Hey yall! We are hiring again!!

Thank you Cultivated Table & Sip House for your business.   go check this place out!
10/23/2026

Thank you Cultivated Table & Sip House for your business.

go check this place out!

10/22/2026

Network segmentation doesn’t start with a VLAN. It starts with infrastructure that can support it.

As updates to the HIPAA Security Rule move forward, healthcare organizations should assess whether their networks are ready to separate clinical, guest, building, and security systems. Shared flat networks, undocumented cabling, and Wi-Fi carrying both patient-monitoring and guest traffic can make clean segmentation difficult. As medical devices and connected systems grow, separating zones can help limit the impact of an incident.

Effective segmentation depends on the physical layer: dedicated cabling paths, appropriately separated switch stacks and PoE capacity, and clearly labeled, documented patching. Without accurate records, tracing a circuit during an incident can be a challenge.

A practical first step is a physical-layer audit and accurate as-builts. From there, phased re-cabling and switch segmentation by zone can be planned with clinical and IT teams around patient care.

OVC-Cabling supports healthcare facilities with structured cabling, fiber backbones, CCTV, access control, and alarm infrastructure designed to support network segmentation.

Build the physical foundation for a more resilient healthcare network.

Address

3418 Industrial Parkway
Jeffersonville, IN
47130

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+15027929909

Alerts

Be the first to know and let us send you an email when OVC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to OVC:

Shortcuts

Share

Nearby computer & electronics services