10/29/2026
As broadband infrastructure evolves, operators face growing challenges in managing critical facility requirements, including increased power density and changing cooling needs.
This SCTE Standards Spotlight features Mike Glaser, Principal Architect at Spectrum and a 2026 SCTE Standards Distinguished Contributor Award recipient!
Glaser has contributed to the development of EMS 048, Critical Facility Cooling Optimization: Steps on the Path to Automation, which is being developed to help broadband operators address changing facility design and operational requirements.
Through collaboration between operators and vendors, this work brings together engineering expertise and operational experience to develop guidance that supports cooling optimization and a path toward automation.
Glaser's participation also reflects the professional value of SCTE Standards, from expanding technical knowledge to developing leadership skills and helping shape industry practices.
Interested in helping shape the future of broadband? Get involved in SCTE Standards and contribute your expertise to the development of industry standards: https://cablela.bs/4yG1MJT