06/06/2024
The keystone terminations for 343labs.com in the 700 rack were completed beautifully this week by Nehad Alabdari and Joe P. Everything is labeled, cut to length in the new Cat6a keystones which means phase 1 is completed. The next sub will now come through to do the sheetrock cutouts for cat6 and on the adjacent wall. All the wall penetrations are being minimized to reduce sound bleed from one room to the other. Acoustic sealant is being used to dampen sound transmission. And double layer sheetrock and wall insulation is being used to further isolate the sound rooms within the recording studio.
We're loving this project because it means we get to support a great NYC company that provides in-person & online and training in New York. If you know us or Jamie Propp you know we love music and jump on any client we can get. Proud to support the AV/IT environment for this growing organization.
Next is phase 2, terminating end locations.