04/16/2026
Another successful job in the books ✅
Our team completed the installation of two new network cable runs at this active warehouse facility: approximately 200 feet from the loading desk to IDF 3. Each run was properly installed, tested, labeled, and patched into the panel and switch ports to ensure reliable connectivity.
From working at height with lifts to final cable testing and verification, this project was completed on-site, on time, and without issues. Clean terminations, verified performance, and a smooth closeout—exactly the standard we deliver every time.
📡 Installed
🔧 Tested
🏷️ Labeled
✅ Released with no issues