Have you noticed how much utility work seems to be happening everywhere lately?
Sometimes it’s obvious road construction or paving. Other times it’s just a few trucks, cones, utility markings, a small section of pavement opened up – and a new asphalt patch when the work is finished.
There’s a reason we tend to see so much of it at once.
In Illinois, warmer months give crews a better window for excavation, restoration and other outdoor work. At the same time, water, sewer, gas, electric and telecommunications networks all have their own projects and schedules. Repairs, new connections, upgrades and relocations can all be happening independently in the same area.
So the crew you pass today may have nothing to do with another work zone a few blocks away tomorrow, even though from the driver’s seat it can feel like construction is everywhere.
And those small patches of fresh asphalt? Often, they’re simply the last visible sign of the work that was completed there.
It may not make the traffic any less frustrating, but at least the orange cones start to make a little more sense. 🙂