Inpixon Inpixon® (Nasdaq: INPX) is the innovator of Indoor Intelligence™, delivering actionable insights for people, places and things.

Inpixon® specializes in AI-powered Indoor Intelligence®, offering advanced RTLS solutions and Location as a Service (LaaS) to enhance efficiency, safety, and innovation across industries.

We asked how your ERP recognizes that a unit changed zones. Here is what you told us:• Manual scan at the station• Paper...
12/11/2026

We asked how your ERP recognizes that a unit changed zones. Here is what you told us:

• Manual scan at the station
• Paper traveler, entered later
• Someone walks and checks
• Automatic location event

For comparison: in an L2L survey of US manufacturers, only three in ten leaders said their operational data reflects the shop floor in real time.

What each answer means for your data:

Manual scan: accurate when it happens. In engineer-to-order routing, it often doesn't, because skilled people are busy building, not scanning.

Paper traveler: the ERP learns hours or days later. Every decision in between runs on old information.

Walking and checking: the most expensive data source in the plant.

Automatic location event: the ERP updates when the unit moves. The next question is which rule that event is checked against.

The pattern behind the first three: they depend on someone remembering. Discipline is easiest to keep when the system enforces it.

11/11/2026

Knowing where something is does not keep a delivery date. Acting on it in time does.

How we bridge plan and reality, in three steps:

Locate
A carrier with a heavy component leaves one station and enters the next. That movement is an event. No scan, no walking.

Sync
The event is matched against the plan. Rule from the MES: the step is booked and checked against the planned sequence and time for this order.

Act
The result goes back to the floor. The next station gets the release. If the sequence or timing is off, the planner gets an alert. Status and next step show on the electronic label at the carrier.

The loop runs both ways: from the floor into your systems, and from your systems back to the floor. The result is a plan and a shop floor that show the same thing.

Siemens Energy Nuremberg runs a steam turbine service site with more than 100 years of history. Brownfield. High-mix, en...
10/11/2026

Siemens Energy Nuremberg runs a steam turbine service site with more than 100 years of history. Brownfield. High-mix, engineered-to-order. Multiple handover points, staging areas and customs clearance zones.

The challenge: keep SAP aligned with what actually happens on the floor, without asking technicians to scan at every transition.

The approach:
• Location of pallets, turbines, components and order documentation across 16 defined zones
• Physical movements trigger automated, auditable postings in SAP
• A plain-language question layer on top for planners and supervisors

The project was inducted into the Champions Circle of the Microsoft Intelligent Manufacturing Award 2026.

05/11/2026

Closing the gap between plan and floor does not start everywhere at once. Two places give the fastest return.

The handover points
Receiving to pre-assembly, pre-assembly to main assembly, main assembly to test, test to final staging. That is where ERP and floor drift apart the most.

The product family with the highest OTD risk
The one where a late delivery hurts most, contractually or for the customer relationship. A focused scope there builds the internal case faster than a general proof of concept.

You do not need to follow every component on day one. You need to know the moment a high-value order stops moving as planned, in time to act.

A turbine rotor moves by overhead crane. Then it waits.Two hours? Two days? Between crane moves, often nobody knows, unl...
04/11/2026

A turbine rotor moves by overhead crane. Then it waits.

Two hours? Two days? Between crane moves, often nobody knows, unless someone walks the floor or checks a paper traveler.

Multiply that by 200 to 300 active work orders and you get the daily routine many planners have normalized: call the supervisor, the supervisor calls a technician, someone finds the unit, the ERP gets updated by hand. If at all.

That waiting time has a name: dwell time. When it is unstable, units sit too long in one zone and rush through the next. The schedule absorbs the difference until it can't.

Once every zone entry is an event, dwell time can be checked against the planned time for that step. When a unit overstays, the planner gets an alert while the order is still recoverable, not at the end of the week.

03/11/2026

Three signs your ERP and your shop floor have drifted apart:

1. Buffer everywhere
Safety stock next to lines, extra days in every quoted lead time, staging areas fuller than planned. Buffer is what a plant builds when it does not trust its own data.

2. Status questions eat the day
If planners spend hours answering "where is order X?", the floor is not reporting where things are. People are.

3. Your best planners have become irreplaceable
When only two people know that unit 4 is really still in test, the plant runs on individual effort, not on its systems.

If two of these sound familiar, the root cause is usually the same: system of record and physical floor no longer match, and people close the gap by hand.

Which one costs your team the most time?

Energy equipment order books are fuller than they have been in decades. Gas turbine backlogs at the major OEMs now stret...
02/11/2026

Energy equipment order books are fuller than they have been in decades. Gas turbine backlogs at the major OEMs now stretch to 2030 (S&P Global).

In a sold-out market, a late unit costs more than a penalty. It puts your slot in the next procurement cycle at risk, at exactly the moment that slot is worth the most.

When a high-value unit ships late, the post-mortem usually starts with the supply chain. Sometimes that is the cause. But in many cases, everything needed to finish the unit was on site weeks before the ship date.

The delay happened on the floor:
• A sub-assembly parked in the wrong staging area
• A kit that was 98% complete, with nobody sure which part was missing
• A unit sitting in rework while the ERP still showed final assembly

In our latest expert interview, Thomas Miller (Chief Customer Officer) and Dr. Norman Dziengel (Head of Product) talk through where OTD actually breaks in engineer-to-order production, and why the gap between ERP and floor is the cost most plants are not measuring.

Link in the comments.

30/10/2026

Happy Halloween from a company that spends an unusual amount of time thinking about traceability.

Manual production confirmations are a tax nobody budgets for.An operator finishes a step, walks to a terminal, types a c...
28/10/2026

Manual production confirmations are a tax nobody budgets for.

An operator finishes a step, walks to a terminal, types a confirmation. Sometimes at the end of the shift, for six steps at once, from memory.

That is where SAP deviations come from. A process that asks people to do data entry on top of their actual job.

When the movement itself posts the confirmation, two things change. The planner works with today's data instead of yesterday's, and the operator stops doing clerical work.

See how Siemens Energy addressed this in Nuremberg. Link in the comments.

Everything inside the hall is tracked. Then the unit goes out to the yard and disappears.For plants building large assem...
27/10/2026

Everything inside the hall is tracked. Then the unit goes out to the yard and disappears.

For plants building large assemblies, the yard holds the most expensive inventory on site and the least information about it. Units get moved to make room for a truck, and the move is recorded nowhere.

What follows is a search that takes two people and most of an hour, for an object weighing several tons that is not exactly hiding.

Outdoor tracking has different requirements from tracking inside the hall. GPS may work well across open yard areas, while BLE or UWB can be used where the site needs a different level of coverage or precision. The right setup depends on the yard, the assets and how accurately each one needs to be located.

Adresse

KnesebeckStr. 62/63
Berlin
10719

Benachrichtigungen

Erfahren Sie als Erste/r von Neuigkeiten und Aktionen: Wir schicken Ihnen eine E-Mail, wenn Inpixon etwas veröffentlicht. Ihre E-Mail-Adresse wird für keinen anderen Zweck verwendet, und Sie können sich jederzeit abmelden.

Service Kontaktieren

Nachricht an Inpixon senden:

Verknüpfungen

Teilen

Computer- Und Elektronikservices in der Nähe