10/23/2026
A broadcast facility shouldn't need a rip-and-replace every few years just to keep up. The walls have been through enough.
The better approach is designing the core for change from day one. Flexible transport and room to grow, so new workflows plug in without calling a demolition crew.
At CTI, that means asking the harder questions early. Where does production grow first? What has to stay on-air while everything around it gets upgraded? Answer those up front, and the facility can absorb new control surfaces and hybrid workflows without rebuilding itself every budget cycle.
Nobody designs for the future by guessing it perfectly. You design a backbone that gives your team options when the future shows up.