Most manufacturing teams don’t have a scheduling problem.
They have a visibility problem.
Jobs are late before anyone can clearly explain why. Material risk, overloaded work centers, bad routings, missing labor feedback, and unrealistic promise dates all get buried until the customer is already asking for answers.
That is the problem I’ve been working on with Grimnir.
The goal is simple:
Know what’s late.
Know why.
Fix it before it costs you.
Still early, still improving, but this short demo shows the direction I think manufacturing software needs to go: practical, visual, and built around how the shop actually runs.
Demo shown with sample data — no customer or employer data included.
Would love feedback from anyone in manufacturing, production control, scheduling, ERP, or operations.